Overall comment
The creation of a wind power plant is included in the program of development of the unified energy system of Russia for 2019-2025.
The annual reduction in CO2 emissions amount 116,000 tons. Wind turbines have no harmful noise impact on the environment due to the slow rotation speed of the blades (2-3 revolutions/min). Noise from operating wind turbines at a distance of 300 meters does not exceed the permissible noise level for residential buildings. For two years, professional wind measurements have been made at the location and the technical and economic feasibility of building a wind power plant has been confirmed The Beregovaia WPP is projected in accordance with the norms and legislation of the Russian Federation with the approval of the project documentation in the Main State Expertise.