Deal #9544 Version 88330 Version 93314
Intended size
228โ€ฏ687 ha
343.15 ha
Size under contract (leased or purchased area)
  • [current] 362.84 ha
Comment on land area
34498 of 228687 or 15% were taken from the total intended size
By combining the size of land plots on the cadastral map, the total area is larger than planned. There is land take, totaling 45 ha, required for infrastructure related the Project, primarily for the transmission line, including land for poles and anchor towers.
Intention of investment
  • [current] Renewable energy unspecified
  • [current] Wind farm
Comment on intention of investment
Twenty-eight 105m high towers of Mingyang turbines (16 of 3.2MW and 12 of 4.0MW output power) will hold 156m diameter blades that will rotate with the wind from 2 to 25 m/s at a rotational speed range of 10-20 rpm.
Twenty-eight 105m high towers of Mingyang turbines (16 of 3.2MW and 12 of 4.0MW output power) will hold 156m diameter blades that will rotate with the wind from 2 to 25 m/s at a rotational speed range of 10-20 rpm. The Project is divided into several companies, each assigned to a separate sub-project: Borey Energo LLP (Borey) โ€“ 20 wind turbines; Energo Trust LLP (Energo Trust) โ€“ 10 wind turbines; Sofievskaya Wind Power Plant LLP (Sofievskaya) โ€“ 8 wind turbines; Arkalyk Wind Power Plant LL (Arkalyk) โ€“ 3 wind turbines, and Jasyl Jel Energy (JJE) โ€“ 3 wind turbines.
Comment on nature of the deal
13 lease agreements
13 lease agreements. Land lease was approved for a period of 49 years. Cadastral numbers of land plots: 01005008424, 01005008425, 01005008426, 01005008427, 01005008429, 01005008430, 01005008431, 01005047220, 01005047227, 01005047226, 01005010347, 01005010341, 01005011045
Negotiation status
  • [2021, current] Concluded (Contract signed)
Implementation status
  • [2022-05-01, current] Startup phase (no production)
  • [2022-05-01] Startup phase (no production)
  • [current] In operation (production)
Comment on implementation status
To determine the local conditions and areaโ€™s vulnerability a survey was carried out from March 16, 2020 to March 3, 2021. Construction of the wind farm started in May 2022.
Operating company
Name of investment project
Borey wind power plant (WPP)
Comment on investment chain
The provision of a senior loan of up to US$ 45.6 million equivalent (in US$ and KZT) to Borey Wind LLP and The provision of a senior secured loan of up to US$ 22 million equivalent (in US$ and KZT) to Energo Trust LLP.
Community consultation
Limited consultation
Comment on consultation of local community
In February, 2020 the Arshaly District Council held a meeting in Bulaksay, which was advertised on the village noticeboard, for attendees to review the allocation of land required for the 156MW extension. The meeting was chaired by the Bulaksay rural area council, with the head of the Arshaly District Council Entrepreneurship Department and attended by 19 village residents. In November, 2020 the Arshaly District Council, along with representatives from the project, held a meeting with residents from Saryoba Station to explain the Project also. There was also an instance where the Councillor had requested a number of crossings over the trenching work to allow for agricultural machinery and animals to cross safely. The Client worked with six herders to determine where best to situate these crossings to meet the herders needs.
Community reaction
Consent
Comment on community reaction
During this meeting the villagers approved the land allocation for the Project, which was documented and included as part of the application for the land lease.
Comment on promised benefits for local communities
If the water is taken from the Bulaksay or Saryoba station water supplies, shortages during the peak time usage may arise. To prevent this, the Company will repair the village pipework and pumps.
Former land owner
State, Private (smallholders)
Comment on former land owner
One source indicates that one of the land plots was in state ownership.
Electricity generation
  • [2023] On-shore wind turbines
    Number of turbines: 20 Currently installed capacity: 100 MW Intended capacity: 220 MW
  • [2023] On-shore wind turbines
    Number of turbines: 30 Currently installed capacity: 150 MW Intended capacity: 220 MW
  • [2023] On-shore wind turbines
    Number of turbines: 38 Currently installed capacity: 189 MW Intended capacity: 220 MW
  • [2023-10-10, current] On-shore wind turbines
    Number of turbines: 41 Currently installed capacity: 206 MW Intended capacity: 220 MW
Comment on electricity generation
The Project is divided into several companies, each assigned to a separate sub-project: Borey Energo LLP (Borey) โ€“ 20 wind turbines; Energo Trust LLP (Energo Trust) โ€“ 10 wind turbines; Sofievskaya Wind Power Plant LLP (Sofievskaya) โ€“ 8 wind turbines; Arkalyk Wind Power Plant LL (Arkalyk) โ€“ 3 wind turbines, and Jasyl Jel Energy (JJE) โ€“ 3 wind turbines.
Overall comment
Added location, Investor info, Intention of investment, Implementation status,Number of total jobs created, Promised benefits for local communities, Water extraction envisaged, Land area, Nature of the deal, Former land cover, data source

Location #mffvdk-L

Location
Arshaly, Kazakhstan
Bulaksay, Kazakhstan
Point
Lat: 52.72275
Lng: 61.14022
Lat: 51.29299
Lng: 72.09259

Location #3YB8_UJ1

areas
unknown field: location.areas
Spatial accuracy level
Exact location
Location
ะŸะก ะ‘ะพั€ะตะน ะญะฝะตั€ะณะพ Borey Energo, ะ‘ัƒะปะฐะบัะฐะน (ะะพะฒะพะฒะปะฐะดะธะผะธั€ะพะฒะบะฐ), ะšะฐะทะฐั…ัั‚ะฐะฝ
Point
Lat: 51.26729
Lng: 72.07168

Data source #X4TIbtwI

Date
2021
Comment on data source
Non-Technical Summary (EN)

Data source #4Lt-WdRt

File
Type
Other
Url
Keep PDF not public
No
Publication title
Kazakhstan: Zhanatas 100 MW Wind Power Plant
Comment on data source
former use, mn

Data source #h67eGwna

File
Type
Research Paper / Policy Report
Keep PDF not public
No
Date
2023-12
Comment on data source
Project Non-Technical Summary for Akmola Wind Farm, December 2023

Data source #4iZMkkCz

File
Type
Other
Url
Keep PDF not public
No
Date
2023-12-01
Organisation
EBRD

Data source #YCw_vYWT

File
Type
Other
Url
Keep PDF not public
No
Date
2023-12-12
Organisation
EBRD

Data source #U-bX2eOJ

File
Type
Government sources
Url
Keep PDF not public
No
Date
2024-06-20
Comment on data source
Cadastral map of Kazakhstan. Information about leased land plots, their size and location. The date of access to the website is indicated

Data source #st7T_gpu

File
Type
Other
Url
Keep PDF not public
No
Date
2024-06-20
Comment on data source
Google Map. Location of Wind farm

Data source #lRmAQtAF

File
Type
Media report
Url
Keep PDF not public
No
Date
2022-11-29

Data source #lCsJ_yOU

File
Type
Media report
Url
Keep PDF not public
No
Date
2023-10-10

Data source #2CgPgA7d

File
Type
Media report
Keep PDF not public
No
Date
2024-01

Contract #P6vu_XLJ

Duration of the agreement
49 years
Comment on contract
Cadastral numbers of land plots: 01005008424, 01005008425, 01005008426, 01005008427, 01005008429, 01005008430, 01005008431, 01005047220, 01005047227, 01005047226, 01005010347, 01005010341, 01005011045