Deal #9451
Serbia
Created at
2022-05-23
Last update
2022-06-20
Last full update
2022-05-23
Water extraction envisaged
Water extraction envisaged
Yes
Comment on water extraction envisaged
The waste from Serbia Zijin Copper operations is deposited on an old dam under which was built a tunnel that secures the Krivelj river’s flow to Ostrelj village. At the end of 2021, the drainage tunnel showed cracks and local media report that toxic substances have leaked into the river.
Source of water extraction
Source of water extraction
River
Comment on source of water extraction
River Pek