Deal #9092
Romania
Created at
2021-11-16
Last update
2024-05-22
Last full update
2024-05-08
Detailed electricity generation information
Electricity generation
- [2014-04, current] On-shore wind turbines
Number of turbines: 42 Currently installed capacity: 84 MW
Comment on electricity generation
The Project is divided into 3 clusters, namely Mesteru (16 turbines – ME), Luminita (11 turbines – LU) and Topolog (15 turbines – TO). The Project has a total installed capacity of 84 MW, comprising 42 wind turbines of 2 MW each.