Land area
Size under contract (leased or purchased area)
- [2021, current] 2743 ha
Size in operation (production)
- [2021, current] 2743 ha
Comment on land area
The six wind farms that make up the Morrinhos Wind Complex occupy approximately 2,743.70 hectares. 145 hectares belonging to the Comunidade Tradicional de Fecho e Fundo de Pasto of Fazenda Quina. Another 134.72 hectares are in the Comunidade Tradicional de Fecho e Fundo de Pasto de Belas and the remainder belongs to properties belonging to people from other regions.
Of the total 2,473.70 hectares of the project, 1,961.74 hectares have the remaining coverage of Caatinga shrub-tree. Another 388.13 hectares are covered by Caatinga Shrub and 123.83 hectares correspond to anthropized areas, with the suppression of vegetation occurring only in the areas where the wind turbines will be installed and in the areas for the implantation and widening of the access roads.
Intention of investment
Intention of investment
- [2021, current] Renewable energy unspecified (2743 ha)
Comment on intention of investment
The complex has six parks, all of which are in operation:
- Ventos da Andorinha:
Entry into operation: November 14, 2015
Effective date: September 13, 2012
End of term: September 13, 2047
Granted power: 30,000.00 kW
Number of wind turbines: 15
Latitude: -10.583277
Longitude: -40.63744738
Owner / Operating regime: 100% para Andorinha Energias Renovaveis S.A. (PIE)
-- Ventos de Campo Formoso I:
Entry into operation: January 23, 2016
Effective date: September 13, 2012
End of term: September 13, 2047
Granted power: 30,000.00 kW
Number of wind turbines: 15
Latitude: -10.62770186
Longitude: -40.68553526
Owner / Operating regime: 100% para Campo Formoso I Energias Renováveis S.A. (PIE)
- Ventos de Campo Formoso II:
Entry into operation: December 8, 2015
Effective date: September 6, 2012
End of term: September 6, 2047
Granted power: 30,000.00 kW
Number of wind turbines: 15
Latitude: -10.51956005
Longitude: -40.61138421
Owner / Operating regime: 100% para Campo Formoso II Energias Renováveis S.A. (PIE)
- Ventos de Guarás I:
Entry into operation: April 26, 2016
Effective date: June 5, 2014
End of term: June 5, 2049
Granted power: 30,000.00 kW
Number of wind turbines: 15
Latitude: -10.6060965
Longitude: -40.65449747
Owner / Operating regime: 100% para Ventos dos Guarás I Energias Renováveis S.A (PIE)
- Ventos de Morrinhos:
Entry into operation: November 14, 2015
Effective date: September 13, 2012
End of term: September 13, 2047
Granted power: 30,000.00 kW
Number of wind turbines: 15
Latitude: -10.56956163
Longitude: -40.62858262
Owner / Operating regime: 100% para Morrinhos Energias Renovaveis S.A. (PIE)
- Ventos do Sertão:
Entry into operation: January 1, 2016
Effective date: September 13, 2012
End of term: September 13, 2047
Granted power: 30,000.00 kW
Number of wind turbines: 15
Latitude: -10.55667941
Longitude: -40.5686764
Owner / Operating regime: 100% para Sertão Energias Renováveis S.A (PIE)
Nature of the deal
Nature of the deal
Lease
Comment on nature of the deal
The area of the wind farm was leased from individual owners and also from traditional communities of Fecho e Fundo de Pasto.
Negotiation status
Negotiation status
- [2012, current] Concluded (Contract signed)
Comment on negotiation status
The concession started in 2012 (five wind farms). The Ventos de Guarás I started the concession in 2014.
Implementation status
Implementation status
- [2015, current] In operation (production)
Comment on implementation status
The operation started in 2015 and 2016.