Please note: you are viewing an old version of this deal. The current version can be found here: Deal #8640

Deal #8640 Version #83816

Senegal
Created at
2021-03-03
Last update
2021-03-03

Overall comment

Overall comment
One of three planned agroprocessing zones with the objective to: *The construction of post-harvest infrastructure (storage, drying, treatment, conditioning for staple food crops, and powered by solar energy (planned installation of 2.834 kW of solar energy); • Promotion of local small-scale irrigation by setting up drip irrigation systems powered by solar pumps to increase production; • the creation of around 20,000 ha of forests managed by agricultural households in a sustainable manner to generate income; • the installation of 3 MW of renewable energy from the production of biogas or approximately 6,682.2 m3 of digester of biogas to treat livestock effluents and produce biogas for heating or electricity production