Deal #8239 Version #82795

Uganda
Created at
2020-08-11
Last update
2020-08-11
Last full update
2023-04-05

Land area

Intended size
388 ha
Size under contract (leased or purchased area)
  • [current] 388.0 ha
Size in operation (production)
  • [2012-08-01, current] 388.0 ha
Comment on land area
The reservoir covers an area of 388 hectares (ha) extending back to the tailrace area of the upstream 180 MW Nalubaale HPP and 200 MW Kiira HPPs. In addition, UETCL owns the power line and the land rights associated with this line that transports the power from the dam to the power stations.

Intention of investment

Intention of investment
  • [current] Renewable energy unspecified
Comment on intention of investment
Hydro power

Nature of the deal

Nature of the deal
Outright purchase

Negotiation status

Negotiation status
  • [current] Concluded (Contract signed)
Comment on negotiation status
Compensation to landowners was already done in 2003

Implementation status

Implementation status
  • [2012-08-01, current] In operation (production)
Comment on implementation status
The Project was commissioned on August 1, 2012 and has been operating with an availability of 99% since then.

Contract farming

Contract farming
No