Size in operation (production)
  • [current] 513.0 ha
  • [current] 513 ha
Comment on intention of investment
Xekaman 3 Hydropower, installed capacity: 250 MW, developed by an independent power producer (IPP)
Xekaman 3 Hydropower, installed capacity: 250 MW, developed by an independent power producer (IPP) Xekaman 3 Power Ltd. Co. is owner of the power plant. Viet-Lao Power Joint Stock Company is the majority shareholder at 85 percent while Electricite du Laos (EDL) holds a share of 15 percent. Main Designer to the hydropower plant was Song Da Consulting JSC. Main contractor was Vietnam-based Song Da Corporation. Construction period was 2006 – 2013 [Source: hobomap]
Comment on implementation status
Construction period is 5 years; The dam was built between 2006 and 2010.
According the press release on 32 Nov 2011 on VLPC website, the project completed the work of compensation and removal from reservoir area. [Source: VLPC website ] Soon after completion the dam started to be plagues by landslide problems at the penstock, which it appears was constructed on an ancient landslide without adequate measures being taken to provide stability. A break in a critical waterway shut down a hydro-electric Xekaman 3 dam, located in southern Laos and raised questions about the quality of construction at the facility that sends most of the power it generates to Vietnam. While officials said on the 16 Dec 2016 break in the Xekaman 3 facility’s penstock posed no threat to people living downstream, it marked the second breakdown in the tunnel that channels water to the power turbine [Source: AGU] As the damage of penstock occurred causing the machine to stop, the unit 1 of the plant has been commercially operated again at 7:30 a.m. on 22 May 2022; Unit 2 at 5:30 pm on 2 June 2022, timely generating and transmitting power to Vietnam under the contract signed before the hot season. [Source: EVN]
Comment on jobs created (total)
Based on the report of press release on company website, nearly 2,000 workers of Song Da Corporation worked on construction of the project. [Source: Company website]
Name of community
Dak Grang Nhay Village, Ban Dakman, Ban Daktaok-Nyai, Ban Daktaok-Noy, Ban Dakmoan, Ban Dak-Eoy, Ban Dakdin, Ban Daknoy, Ban Kunsai, Ban Rak and Ban Daksuan.
Community consultation
Not consulted
Comment on consultation of local community
Many villages in the upstream and downstream of the Xekaman 3 dam did not receive information about estimated losses to fisheries, wild foods and land prior to construction. As a result, village headmen reported that people were not prepared for these losses and were not offered compensation either before or after construction began. [Source: International Rivers]
Community reaction
Rejection
Comment on community reaction
The headman and village families in Ban Dakman say that over the past two years, they have written letters to Song Da personnel to request the building of a gravity-fed pump that could provide a source of potable water. They never received a reply. [Source: International Rivers]
Comment on displacement of people
According to the project document for CDM, 57 households with around 342 people were affected due to the project. No people were dislocated. Compensation and support were given to affected people. The project was also being evaluated for WCD (World Commission on Dams) compliance. Another source (RFA) reported that there were about 200 families or around 1200 households affected by this dam construction. [Source: CDM & RFA]
Negative impacts for local communities
Environmental degradation
Comment on negative impacts for local communities
Villagers said that significant declines in fish catches of around 90-95% since construction activities began. [Source: International Rivers]
Materialized benefits for local communities
Health, Education, Productive infrastructure (e.g. irrigation, tractors, machinery...), Roads
Comment on materialized benefits for local communities
On company website, it reported that the project investor built a new school and upgraded a hospital valued at 126,000 USD in Dakcheung district, Sekong province. It was also reported that the compensated land was to build roads 16B, D4, D3, TC17, TC15B. [Source: Company website & CDM]
Overall comment
The project will reduce GHG emissions by annually 792,824 tCO2 by producing electricity with a renewable source thus substituting electricity produced in Vietnam to a large extent by fossil means. Only electricity sold to Vietnam is accounted for. The electricity supplied to Laos will thus not be included in any ER calculations. Only the combined grid factor Vietnam is taken to determine the Combined Margin. pSource: Validation report of CDM[ According satellite images reported by Hobomap, there is the possible expansion of Xekaman 3 tributary river system and reservoir may be the new dam and reservoir at Dak Cheung town. [Source: hobomap]

Location #-mbCXYSk

Comment
located on Nam Pagnou River, the main tributary of Xekaman river, Dak Cheung district, Sekong province, Lao PDR.
located on Nam Pagnou River, the main tributary of Xekaman river, Dak Cheung district, Sekong province, Lao PDR. The project catchment area is 725 square kilometers (72,500 ha) Source: hobomap

Data source #X8GjYwTo

File
nid
unknown field
Type
Media report
Keep PDF not public
No
Publication title
Laos’ Xekaman 3 Dam Break Shuts Off Power to Vietnam β€” Radio Free Asia
Date
2016-12-22

Data source #PG2eUC1w

File
nid
unknown field
Type
Company sources
Keep PDF not public
No
Publication title
PDD Xekaman 3 version 1.5

Data source #i9QpPvFN

File
nid
unknown field
Type
Media report
Url
Keep PDF not public
No
Publication title
Repairing Xekaman hydropower 3_ Shared by insiders.pdf

Data source #m4li2aka

File
nid
unknown field
Type
Research Paper / Policy Report
Url
Keep PDF not public
No
Publication title
About the damage of the penstock of Xekaman 3 dam
Date
2015-03-12

Data source #aYUJWfN5

File
nid
unknown field
Type
Media report
Keep PDF not public
No
Publication title
The second river closing ceremony of Xekaman 3 Hydropower Project
Date
2021-11-21

Data source #9UJvQdEN

File
nid
unknown field
Type
Company sources
Keep PDF not public
No
Publication title
Validation Report for Xekaman 3 dam (V3)

Data source #42_dBd88

File
nid
unknown field
Type
Company sources
Keep PDF not public
No
Publication title
Vietnamese Minister of Construction visits Xekaman 3 Hydropower Project work site in Lao PDR

Data source #x8QEvbTG

File
nid
unknown field
Type
Media report
Keep PDF not public
No
Publication title
Xekaman 3 Dam Hydropower Info
Comment on data source
Maps and photos of the project

Data source #vVNgJLsL

File
nid
unknown field
Type
Company sources
Keep PDF not public
No
Publication title
Xekaman 3 dam_community concerns_IR
Comment on data source
Letter from International Rivers to Viet-Lao Power Joint Stock Company, showing concerns about the project

Data source #l0CWaM68

File
nid
unknown field
Type
Media report
Url
Keep PDF not public
No
Publication title
Xekaman 3 hydroelectric plant in Laos: a very major landslide in December

Data source #AxUKhL-H

File
nid
unknown field
Type
Media report
Keep PDF not public
No
Comment on data source
Written in local dialect

Contract #_6JG8u2r

nid
unknown field
Date
2006
Duration of the agreement
29 years
Comment on contract
It says on World bank website that the contract period is 29 years [Source: WB]