Deal #5370 Version 72185 Version 92685
Size under contract (leased or purchased area)
  • [2016, current] 242.0 ha
  • [2009, current] 262 ha
Size in operation (production)
  • [2017, current] 262 ha
Comment on land area
In Panel 1's report "Barro Blanco Hydroelectric Project Panama" (2015), it is mentioned that the project consists of a hydroelectric plant at the foot of the dam, whose main works will require the flooding of an area of 258.67 hectares for the operation of the reservoir on the Tabasará River, and 5 hectares for the dam, powerhouse, and complementary works.
Intention of investment
  • [current] Renewable energy unspecified
  • [2009, current] Renewable energy unspecified
Comment on intention of investment
Hydroelectric Central Barro Blanco
The project consists of a hydroelectric plant.
Nature of the deal
Lease
Outright purchase
Comment on nature of the deal
Generadora del Istmo S.A. (Genisa) acquired 100% of the land needed for the dam, power plant, access roads, transmission lines, and substations. Genisa also successfully acquired 97% of the land required for the reservoir.
Negotiation status
  • [2007, current] Concluded (Contract signed)
  • [2009, current] Concluded (Contract signed)
Implementation status
  • [2016, current] Startup phase (no production)
  • [2016] Startup phase (no production)
  • [2017, current] In operation (production)
Comment on implementation status
The project began operating with the authorization to start commercial operation from the Panamanian government in April 2017, following the completion of technical tests in March 2017.
Name of indigenous people
Ngäbe-Buglé
Presence of land conflicts
Yes
Comment on electricity generation
The Barro Blanco project is a hydroelectric power project in the Republic of Panama, with an installed capacity of approximately 29 MW and an estimated annual production of 140,000 MWh.
Fully updated
No
Yes

Location #YHzVMhZ3

Spatial accuracy level
Exact location
Coordinates
Point
Lat: 8.21435
Lng: -81.59422
Lat: 8.21525
Lng: -81.59405
Description
The project is located on the Tabasará River, Chiriquí Province, Tolé District, approximately 1.5 km from the Pan-American Highway.
Facility name
Central Hidroeléctrica Barro Blanco

Data source #8qS0bHKx

File
Type
Media report
Url
Keep PDF not public
No

Data source #NjTnxbS6

Publication title
ONU califica al acuerdo de Barro Blanco como 'referente histórico para la comunidad internacional'
Date
2016-08-25

Data source #lBDdjFpn

File
Type
Media report
Url
Keep PDF not public
No

Data source #wVwsybt_

Url
Publication title
PANAMA/ CONFLICTO DE BARRO BLANCO: MENTIRA Y REPRESION DEL GOBIERNO
Date
2016-09-03
Comment on data source
Original URL expired: http://portaldelaizquierda.com/2016/09/panama-conflicto-de-barro-blanco-mentira-y-represion-del-gobierno/

Data source #GRn5nRqQ

File
Type
Media report
Url
Keep PDF not public
No

Data source #2cDQRKIG

Publication title
Indígenas que se oponen a una hidroeléctrica retienen al presidente de Panamá
Date
2016-08-23

Data source #AE0SgRGF

Publication title
Barro Blanco: La histórica polémica por contaminación en Panamá
Date
2016-09-12

Data source #Rqr1u4Hs

File
Type
Media report
Url
Keep PDF not public
No

Data source #9HLyD2lx

File
Type
Research Paper / Policy Report
Url
Keep PDF not public
No

Data source #IsAp1Vg1

File
Type
Company sources
Url
Keep PDF not public
No

Data source #cW8Dubb7

Publication title
Barro Blanco
Date
2016

Data source #nivZtSQS

Publication title
Panamá: La resistencia indígena Ngäbé Büglé ante la hidroeléctrica Barro Blanco
Date
2016-05-27

Data source #1YBqyefB

Publication title
Panamá propone a indígenas que Genisa no opere hidroeléctrica Barro Blanco
Date
2016-06-09

Data source #PK8y05Wu

Publication title
Panamá: comienza llenado de polémica hidroeléctrica de Barro Blanco
Date
2016-05-24

Data source #K8wcGYt6

File
Type
Company sources
Url
Keep PDF not public
No

Data source #pLdZ03TJ

File
Type
Company sources
Url
Keep PDF not public
No

Data source #lsPafgyN

File
Type
Research Paper / Policy Report
Url
Keep PDF not public
No

Data source #je9XI2hU

File
Type
Media report
Url
Keep PDF not public
No
Publication title
La presa Barro Blanco en Panamá empezará a operar a pesar de la oposición indígena
Date
2017-03-29
Comment on data source
The news mentions the start of operations of the hydroelectric power plant.

Data source #6jcB1Mz1

File
Type
Research Paper / Policy Report
Url
Keep PDF not public
No
Publication title
Informe de investigación - Acerca de los supuestos incumplimientos con los compromisos sociales y ambientales del PNUD en relación a los siguientes proyectos del PNUD: “Fortalecimiento institucional para la gestión basada en resultados del Ministerio de Relaciones Exteriores de la República de Panamá” y “Apoyo al Programa de Reformas del MINGOB”
Date
2018-08-15
Comment on data source
Research report that contains general information about the project, a description of the events surrounding the project, and conflicts arising from its implementation.

Data source #xiV16QYa

File
Type
Research Paper / Policy Report
Url
Keep PDF not public
No
Publication title
TERCER INFORME DE SEGUIMIENTO - Del Mecanismo Independiente de Quejas de FMO, DEG y PROPARCO para el proyecto hidroeléctrico Barro Blanco en Panamá
Date
2022-10-04
Comment on data source
Information on monitoring and implementation status of the project.

Data source #IYzdJ4kX

File
Type
Media report
Url
Keep PDF not public
No
Publication title
Preguntas y respuestas sobre el proyecto de energía hidroeléctrica Barro Blanco en Panamá, 5 de agosto de 2017
Date
2017-08-05
Comment on data source
General information about the project: area, installed capacity, commissioning, land acquisition method, and conflicts.