Version 70785 Version 70786
Implementation status
  • [2009, current] In operation (production)
  • [2009] In operation (production)
  • [2019, current] Project abandoned
Comment on implementation status
CAMEC brought the concession into operation in 2004.
CAMEC brought the concession into operation in 2004. Boss Mining was placed on care and maintenance at the end of February 2019
Name of investment project
Kakanda mine

Location #qesJOkpt

Comment
Luita (22km from Kakanda), Kakanda Province of the Democratic Republic of the Congo (DRC)
Luita (22km from Kakanda), Kakanda Province of the Democratic Republic of the Congo (DRC). Exploitation permits 463, 467, 468, 469 and 2589

Data source #0dDC9f4e

Publication title
CEO of Boss Mining Leads Kakanda to a Better Future
Comment on data source
Forbes Custom- Laurent DΓ©calion, CEO of Boss Mining Leads Kakanda to a Better Future
Forbes Custom- Laurent DΓ©calion, Link no longer works.

Data source #2XVPlhyj

Date
2009-03-03
Open Contracting ID
Comment on data source
JV agreement

Data source #vDpfImSj

Comment on data source
Great Mines, International Mines- CAMEC
Great Mines, International Mines- CAMEC Link no longer goes to CAMEC but to home page instead.

Data source #vEoxrrof

Publication title
ENRC to halt production of cobalt oxide concentrates in 2015
Comment on data source
Metal Bulletin- ENRC to halt production of cobalt oxide concentrates in 2015
Metal Bulletin

Data source #uuz2YGMY

Publication title
ENRC’s Kakanda mine orders FLSmidth equipment package
Comment on data source
International Mining- ENRC’s Kakanda mine orders FLSmidth equipment package
International Mining

Data source #ZhAvGN6m

Url
Publication title
Boss Mining A DRC cobalt and copper producer

Data source #ROKKoLqC

Comment on data source
African Mining Brief- Luita copper and cobalt facility
African Mining Brief- Luita copper and cobalt facility Website no longer exists.

Data source #JIFGKjqT

Comment on data source
Mining Atlas- Kakanda
Mining Atlas- Kakanda. Website no longer exists

Data source #k3YP42un

nid
unknown field
Type
Media report
Url
Keep PDF not public
No
Publication title
ERG will suspend copper, cobalt output at Congo mine this month
Date
2019-02-19

Data source #7hjIrahi

nid
unknown field
Type
Contract
Url
Keep PDF not public
No
Date
2018-11-14
Open Contracting ID
Comment on data source
Updated JV agreement