Please note: you are viewing an old version of this deal. The current version can be found here: Deal #1895

Deal #1895 Version #56118

Tanzania
Created at
2013-02-15
Last update
2017-09-08
Last full update
2024-04-10

Water extraction envisaged

Water extraction envisaged
Yes
Comment on water extraction envisaged
Water rights were allocated to the company in 2013 (30 year water permit to sustain 12,000ha). Irrigation technologies such as sub surface drip, centre pivot and semi solid sprinkler types. Drain water from the farm is directed into ponds (natural and/or management) and the water recycled back to irrigation ponds.

Source of water extraction

Source of water extraction
Surface water, River
Comment on source of water extraction
Wami River. it is asserted that SEKAB BT removed a finding that showed that the amount of irrigation required on the project’s sugarcane plantations would be “high and sometimes exceed available water” from the Wami River—even as nearby residents and ecosystems rely on the same water source.

How much water is extracted?

Water extraction amount
160 000 000 m3/year
Comment on how much water is extracted
The daily maximum water requirement for the 850 ha pilot plot is estimated at 0.59 m3/s, increasing to 11.8m3/s when the project is operating at full capacity. Estimated 160 million m3/year required for 21000hectares.