Deal #10799

Myanmar
Created at
2024-10-13
Last update
2024-12-09
Last full update
2024-12-09

Detailed electricity generation information

Electricity generation
  • [current] Solar (Photovoltaic) 59.81 ha
    Currently installed capacity: 31,82 MW
Comment on electricity generation
The project scenario consists of the installation of 74,592 pieces of 540Wp polycrystalline silicon PV module, providing a total DC capacity of 40.28MWp. The expected net annual power supply to the grid is 63779.85MWh. The expected full load operating hours are 1,583 h annually, and the plant load factor is 18.08% DC side peak capacity of 40.28 MWp. AC side installed capacity 31.824 MWac

Detailed carbon sequestration/offsetting information

Carbon sequestration/offsetting
  • [2023-02-07–2030-02-06, current] Solar park ( 59.81 ha)
    Estimated emission reduction/removal during project lifetime: 161 098 tCO2e
    Estimated annual emission reduction/removal: 23 014 tCO2e
    Certification standard: Yes
    Name of certification standard/mechanism: Verified Carbon Standard (VCS)
    ID of certification standard/mechanism: Project 4583