The Tataouine Solar PV project site spans 200 hectares, including 160 ha for PV module arrays, 4 ha for inverter stations, 1.3 ha for the main substation, 0.2 ha for the office/O&M building, 4.5 ha for drainage, 2 ha for roads, and 28 ha for unused/buffer area.
Comment on intention of investment
Solar park
Comment on nature of the deal
The solar plant will be constructed on a leased land of 200 hectares, reasonably flat, well exposed, easily accessible, and whose ground is sufficiently compact to install a solar plant. The concession for the Project was awarded in 2019 following a competitive tender to a consortium coordinated and led on an operational day-to-day basis by AMEA Power
The solar plant will be constructed on a leased land of 200 hectares, reasonably flat, well exposed, easily accessible, and whose ground is sufficiently compact to install a solar plant. The concession for the Project was awarded in 2019 following a competitive tender to a consortium coordinated and led on an operational day-to-day basis by AMEA Power. The land allocated for the construction of the photovoltaic power plant of Kairouan, with an area of 200 hectares, is part of the private domain of the State. This land is the object of the land title nΒ° 9796/20323 K which covers an area of 7323 hectares 23 ares and 47 centiares in Metbasta, in the delegations of Kairouan Nord and Sbikha, in the governorate of Kairouan, Tunisia.
Comment on jobs created (domestic)
The Tataouine Solar PV project will create around 450 jobs during the 16-month construction phase, with 100 skilled (engineers, technicians) and 350 unskilled (laborers, security). During the 20-year operation phase, it will sustain 45 jobs, including 10 skilled and 35 unskilled positions.
Actors involved in the negotiation / admission process
  • Governorate of Kairouan Government / state institutions (government, ministries, departments, agencies etc.)
  • Government of Tunisia Government / state institutions (government, ministries, departments, agencies etc.)
Comment on investment chain
A 20-year power purchase agreement (PPA) was signed by the Developer and the Tunisian Company of Electricity and Gas (STEG).
A 20-year power purchase agreement (PPA) was signed by the Developer and the Tunisian Company of Electricity and Gas (STEG). AMEA Power and TBEA Xinjiang New Energy (each owning 50% stake).
Former land use
Pastoralism
Comment on former land use
The project site is vacant, with no physical structure. Apart from cattle grazing, no other economic activities are undertaken on the site
Electricity generation
  • [2019, current] Solar (Photovoltaic) 200 ha
    Currently installed capacity: 100 MW
  • [2019, current] Solar (Photovoltaic) 200 ha
    Intended capacity: 100 MW
Comment on electricity generation
The solar plant (100MW).
Water extraction envisaged
Yes
Comment on water extraction envisaged
Minimal water usage typical for solar PV projects, primarily for occasional cleaning of the panels

Location #xoTjlAx7

Description
The Project site is located within Kairouan Governorate, and more specifically in the delegation on Sbikha, and within El Alem Sector
The Project site is located within Kairouan Governorate, and more specifically in the delegation on Sbikha, and within El Alem Sector.

Data source #GHL9oNVl

Organisation
Ameapower

Data source #1MouJpBN

Organisation
amea power

Data source #YrD8RJAu

Organisation
Disclosure

Data source #Z5P7tKWs

File
Type
Media report
Url
Keep PDF not public
No
Publication title
Power plant profile: Kairouan Solar PV Park 3, Tunisia
Date
2024-02-05
Organisation
Power Technology

Data source #fdrh2y2S

File
Type
Media report
Url
Keep PDF not public
No
Publication title
Environmental and Social Impact Assessment (ESIA) 100 MW Kairouan Solar Power Project
Date
2022-10
Organisation
EAM

Data source #_xSYCfPn

File
Type
Company sources
Url
Keep PDF not public
No
Publication title
AMEA Power wins 200-MW solar project in Tunisia
Date
2024-05-10
Organisation
Renewable Now

Data source #7G9qjyYX

File
Type
Media report
Url
Keep PDF not public
No
Publication title
TUNISIA_ Amea Obtains Loans for the Construction of its Solar Park in Kairouan
Date
2023-02-05
Name
Jean Marie Takouleu
Organisation
Afrik 21

Contract #utna1ZqH

Comment on contract
The proposed investment seeks to support a 100MW solar photovoltaic (β€œPV”) project in Tunisia under a 20-year Power Purchase Agreement with the SociΓ©tΓ© Tunisienne de l'ElectricitΓ© et du Gaz (Tunisian Company of Electricity and Gas – β€œSTEG”) (the β€œProject”). After the operational time of 20 years, the Project is planned to be decommissioned. The decommissioning activities include the disconnection of the components, as well as the restoration of the Site and the internal road network and the removal of the fences
The proposed investment seeks to support a 100MW solar photovoltaic (β€œPV”) project in Tunisia under a 20-year Power Purchase Agreement with the SociΓ©tΓ© Tunisienne de l'ElectricitΓ© et du Gaz (Tunisian Company of Electricity and Gas – β€œSTEG”) (the β€œProject”). After the operational time of 20 years, the Project is planned to be decommissioned. The decommissioning activities include the disconnection of the components, as well as the restoration of the Site and the internal road network and the removal of the fences. The buyer is SociΓ©tΓ© Tunisienne de l'ElectricitΓ© et du Gaz (Steg). Rate: $0.028/kWh.With a capacity 100 MW to be procured.