Deal #10312 Version 95799 Version 95801
Comment on implementation status
Phase 1 was commissioned in June 2015, with construction begining in March 2014 Phase 2 construction was reported starting in 2023, and was commissioned in April 2024
Phase 1 was commissioned in June 2015, with construction begining in March 2014 Phase 2 construction was reported starting in 2023, and was commissioned in April 2024. However, construction stop for 3 turbines of Phase 2 due to compliance issues.
Electricity generation
  • [2015-06] On-shore wind turbines 686 ha 0 %
    Number of turbines: 18 Currently installed capacity: 36 MW Intended capacity: 36 MW
  • [2024-01-2, current] On-shore wind turbines 686 ha 0 %
    Number of turbines: 24 Currently installed capacity: 49,2 MW Intended capacity: 49.2 MW
  • [2015-06] On-shore wind turbines 686 ha 0 %
    Number of turbines: 18 Currently installed capacity: 36 MW Intended capacity: 36 MW
  • [2024-01-2, current] On-shore wind turbines 686 ha 0 %
    Number of turbines: 21 Currently installed capacity: 49,2 MW Intended capacity: 49.2 MW
Comment on electricity generation
Total capacity of both phases is 49.2 MW with phase 1 being 18 turbines generating 36 MW, and phase 2 adding 6 turbines generating 13.2 MW. The Nabas Wind Power Phase 1 (NWPP-1) consists of 18 wind turbines (WTG-1toWTG-18) 3 with a total power production capacity of 36MW, transmission lines, internal access roads, and a control station located in the barangays of Pawa, Rizal, and Unidos inNabas and Brgy. Napaan in Malay. the Nabas Wind Power Phase 2 (NWPP-2) would involve seven additional wind turbines (WTG-19 to WTG-25) with an expected total power generating capacityof 14MW located within the northern boundary of the NPPNP
Total capacity of both phases is 49.2 MW with phase 1 being 18 turbines generating 36 MW, and phase 2 adding 6 turbines generating 13.2 MW. The Nabas Wind Power Phase 1 (NWPP-1) consists of 18 wind turbines (WTG-1toWTG-18) with a total power production capacity of 36MW, transmission lines, internal access roads, and a control station located in the barangays of Pawa, Rizal, and Unidos inNabas and Brgy. Napaan in Malay. the Nabas Wind Power Phase 2 (NWPP-2) would involve seven additional wind turbines (WTG-19 to WTG-25) with an expected total power generating capacityof 14MW located within the northern boundary of the NPPNP. The construction of 3 turbines of Phase 2 have been stopped. ,