Land area

Size under contract (leased or purchased area)
  • [2021, current] 2854.0 ha
Size in operation (production)
  • [2021, current] 2854.0 ha
Comment on land area
According to the Generation Information System of the National Electric Energy Agency (SIGA/ANEEL), the complex has 21 wind farms. All terms began between 2018 and 2019 and the parks were put into operation between 2020 and 2021. The wind complex was publicly inaugurated on June 10, 2021, being considered the largest wind complex in South America.

Intention of investment

Intention of investment
  • [2021, current] Renewable energy unspecified (2854.0 ha)

Nature of the deal

Nature of the deal
Lease

Negotiation status

Negotiation status
  • [2018, current] Concluded (Contract signed)

Implementation status

Implementation status
  • [2020, current] In operation (production)