Deal #8767

Egypt, Arab Rep.
Created at
2021-06-08
Last update
2024-07-06

Former land owner (not by constitution)

Former land owner
Other
Comment on former land owner
The project site is uninhabited flat, stony desert terrain, located around 2 km from the Red Sea. The area has been designated for petroleum exploration activities (subsurface) and wind development (above ground).

Former land use

Former land use
Other
Comment on former land use
The project area was previously allocated to NREA through a presidential decree in March 2016. The land was primarily used for purposes related to petroleum production and related infrastructure,