Please note: you are viewing an old version of this deal. The current version can be found here: Deal #8735

Deal #8735 Version #84019

Brazil
Created at
2021-05-27
Last update
2021-10-06
Last full update
2024-04-19

Land area

Size under contract (leased or purchased area)
  • [2021, current] 2743.0 ha
Size in operation (production)
  • [2021, current] 2743.0 ha
Comment on land area
The six wind farms that make up the Morrinhos Wind Complex occupy approximately 2,743.70 hectares. 145 hectares belonging to the Comunidade Tradicional de Fecho e Fundo de Pasto of Fazenda Quina. Another 134.72 hectares are in the Comunidade Tradicional de Fecho e Fundo de Pasto de Belas and the remainder belongs to properties belonging to people from other regions. Of the total 2,473.70 hectares of the project, 1,961.74 hectares have the remaining coverage of Caatinga shrub-tree. Another 388.13 hectares are covered by Caatinga Shrub and 123.83 hectares correspond to anthropized areas, with the suppression of vegetation occurring only in the areas where the wind turbines will be installed and in the areas for the implantation and widening of the access roads.

Intention of investment

Intention of investment
  • [2021, current] Renewable energy unspecified (2743.0 ha)
Comment on intention of investment
The complex has six parks, all of which are in operation: - Ventos da Andorinha: Entry into operation: November 14, 2015 Effective date: September 13, 2012 End of term: September 13, 2047 Granted power: 30,000.00 kW Number of wind turbines: 15 Latitude: -10.583277 Longitude: -40.63744738 Owner / Operating regime: 100% para Andorinha Energias Renovaveis S.A. (PIE) -- Ventos de Campo Formoso I: Entry into operation: January 23, 2016 Effective date: September 13, 2012 End of term: September 13, 2047 Granted power: 30,000.00 kW Number of wind turbines: 15 Latitude: -10.62770186 Longitude: -40.68553526 Owner / Operating regime: 100% para Campo Formoso I Energias Renováveis S.A. (PIE) - Ventos de Campo Formoso II: Entry into operation: December 8, 2015 Effective date: September 6, 2012 End of term: September 6, 2047 Granted power: 30,000.00 kW Number of wind turbines: 15 Latitude: -10.51956005 Longitude: -40.61138421 Owner / Operating regime: 100% para Campo Formoso II Energias Renováveis S.A. (PIE) - Ventos de Guarás I: Entry into operation: April 26, 2016 Effective date: June 5, 2014 End of term: June 5, 2049 Granted power: 30,000.00 kW Number of wind turbines: 15 Latitude: -10.6060965 Longitude: -40.65449747 Owner / Operating regime: 100% para Ventos dos Guarás I Energias Renováveis S.A (PIE) - Ventos de Morrinhos: Entry into operation: November 14, 2015 Effective date: September 13, 2012 End of term: September 13, 2047 Granted power: 30,000.00 kW Number of wind turbines: 15 Latitude: -10.56956163 Longitude: -40.62858262 Owner / Operating regime: 100% para Morrinhos Energias Renovaveis S.A. (PIE) - Ventos do Sertão: Entry into operation: January 1, 2016 Effective date: September 13, 2012 End of term: September 13, 2047 Granted power: 30,000.00 kW Number of wind turbines: 15 Latitude: -10.55667941 Longitude: -40.5686764 Owner / Operating regime: 100% para Sertão Energias Renováveis S.A (PIE)

Nature of the deal

Nature of the deal
Lease
Comment on nature of the deal
The area of the wind farm was leased from individual owners and also from traditional communities of Fecho e Fundo de Pasto.

Negotiation status

Negotiation status
  • [2012, current] Concluded (Contract signed)
Comment on negotiation status
The concession started in 2012 (five wind farms). The Ventos de Guarás I started the concession in 2014.

Implementation status

Implementation status
  • [2015, current] In operation (production)
Comment on implementation status
The operation started in 2015 and 2016.