| Comment on intention of investment | Nam Ngum 5 Hydropower, installed capacity: 120 MW, developed by an independent power producer (IPP) | Nam Ngum 5 Hydropower, installed capacity: 120 MW, developed by an independent power producer (IPP)
Nam Ngum 5 Hydropower Project was designed to qualify as a greenhouse-gas-reducing project under the Clean Development Mechanism (CDM) of the Kyoto Protocol and receive carbon reduction credits that can be sold.
[Source: Hobomap] |
| Comment on nature of the deal | The project has a 25-year concession agreement. After the end of the concession period, ownership of the plant will be transferred to the Lao government. | The project has a 25-year concession agreement. After the end of the concession period, ownership of the plant will be transferred to the Lao government.
Financing for the $200 million USD project was expected to come primarily from the National Bank of China
[Source: Hobomap] |
| Comment on implementation status | The project construction commenced in 2008 and subsequently entered into commercial operation in 2012.
Source: Power Technology | |
Employment | ||
Investor info | ||
Local communities / indigenous peoples | ||
| Name of indigenous people | Hmong and Khmu ethnic groups and [Source: EIA report] | |
| Comment on negative impacts for local communities | In the EIA report, it stated that if Nam Ngum 5 project had been constructed and completed before Nam Ngum 3 project, Xiangdet village would be also affected by Nam Ngum 5 project as a downstream impact.
[Source: EIA report]
However, some civil society organizations raised concern over the impact on fish migration as well as the irregular of water level that caused impact to the livelihood of local residents.
[Source: RFA Lao] | |
| Materialized benefits for local communities | Education | |
| Comment on materialized benefits for local communities | The company contributed fund to build school at Chim village in Phoukhoun district, Lungprabang province
Source: Muan.Sanook | |
Former use | ||
| Former land cover | Cropland and Forest land | |
Produce info | ||
Water | ||
Gender-related info | ||
Overall comment | ||
Meta | ||
Locations | ||
Location #7baVEd0s | ||
| Comment | The main dam is located in Luang Prabang province, while the powerhouse is situated in Xieng Khuang province.The coordinates of the dam structure are east longitude of 102ยฐ27โ9.13โ and north latitude of 19ยฐ21โ23.80โ. The coordinates of the powerhouse are east longitude of 102ยฐ42โ44.00โ and north latitude of 19ยฐ21โ35.83โ. | The main dam is located in Luang Prabang province, while the powerhouse is situated in Xieng Khuang province.The coordinates of the dam structure are east longitude of 102ยฐ27โ9.13โ and north latitude of 19ยฐ21โ23.80โ. The coordinates of the powerhouse are east longitude of 102ยฐ42โ44.00โ and north latitude of 19ยฐ21โ35.83โ.
Nam Ngum 5 is located upstream of the Nam Ngum 3 Dam
Source: Hobomap |
Data sources | ||
Data source #9i0IlHtw | ||
| URL | ||
Data source #OquKGMCL | ||
| File | ||
| Type | Media report | |
| Keep PDF not public | No | |
| Publication title | Nam Ngum 5 dam officially open | |
| Comment on data source | Written in local dialect | |
Data source #P4PjuP-F | ||
| File | ||
| Type | Other | |
| URL | ||
| Keep PDF not public | No | |
| Comment on data source | Written in local dialect | |
Data source #QIh8Ur-t | ||
| File | ||
| Type | Company sources | |
| Keep PDF not public | No | |
| Publication title | Nam Ngum 5 Hydropower Project, Laos | |
Data source #SsZIdy4N | ||
| File | ||
| Type | Media report | |
| Keep PDF not public | No | |
| Publication title | Namngum 5 dam built school | |
| Comment on data source | written in local dialect | |
Data source #Zgo9BKtK | ||
| File | ||
| Type | Company sources | |
| Keep PDF not public | No | |
| Publication title | Nam Ngum5 report - EIA | |
Contracts | ||