Comment on intention of investment | Nam Ngum 5 Hydropower, installed capacity: 120 MW, developed by an independent power producer (IPP) | Nam Ngum 5 Hydropower, installed capacity: 120 MW, developed by an independent power producer (IPP)
Nam Ngum 5 Hydropower Project was designed to qualify as a greenhouse-gas-reducing project under the Clean Development Mechanism (CDM) of the Kyoto Protocol and receive carbon reduction credits that can be sold.
[Source: Hobomap] |
Comment on nature of the deal | The project has a 25-year concession agreement. After the end of the concession period, ownership of the plant will be transferred to the Lao government. | The project has a 25-year concession agreement. After the end of the concession period, ownership of the plant will be transferred to the Lao government.
Financing for the $200 million USD project was expected to come primarily from the National Bank of China
[Source: Hobomap] |
Comment on implementation status | The project construction commenced in 2008 and subsequently entered into commercial operation in 2012.
Source: Power Technology | |
Employment | ||
Investor info | ||
Local communities / indigenous peoples | ||
Name of indigenous people | Hmong and Khmu ethnic groups , [Source: EIA report] | |
Comment on negative impacts for local communities | In the EIA report, it stated that if Nam Ngum 5 project had been constructed and completed before Nam Ngum 3 project, Xiangdet village would be also affected by Nam Ngum 5 project as a downstream impact.
[Source: EIA report]
However, some civil society organizations raised concern over the impact on fish migration as well as the irregular of water level that caused impact to the livelihood of local residents.
[Source: RFA Lao] | |
Materialized benefits for local communities | Education | |
Comment on materialized benefits for local communities | The company contributed fund to build school at Chim village in Phoukhoun district, Lungprabang province
Source: Muan.Sanook | |
Former use | ||
Former land cover | Cropland, Forest land | |
Produce info | ||
Water | ||
Gender-related info | ||
Overall comment | ||
Meta | ||
Locations | ||
Location #7baVEd0s | ||
Comment | The main dam is located in Luang Prabang province, while the powerhouse is situated in Xieng Khuang province.The coordinates of the dam structure are east longitude of 102Β°27β9.13β and north latitude of 19Β°21β23.80β. The coordinates of the powerhouse are east longitude of 102Β°42β44.00β and north latitude of 19Β°21β35.83β. | The main dam is located in Luang Prabang province, while the powerhouse is situated in Xieng Khuang province.The coordinates of the dam structure are east longitude of 102Β°27β9.13β and north latitude of 19Β°21β23.80β. The coordinates of the powerhouse are east longitude of 102Β°42β44.00β and north latitude of 19Β°21β35.83β.
Nam Ngum 5 is located upstream of the Nam Ngum 3 Dam
Source: Hobomap |
Data sources | ||
Data source #9i0IlHtw | ||
Url | ||
Data source #OquKGMCL | ||
File | ||
Type | Media report | |
Keep PDF not public | No | |
Publication title | Nam Ngum 5 dam officially open | |
Comment on data source | Written in local dialect | |
Data source #P4PjuP-F | ||
File | ||
Type | Other | |
Url | ||
Keep PDF not public | No | |
Comment on data source | Written in local dialect | |
Data source #QIh8Ur-t | ||
File | ||
Type | Company sources | |
Keep PDF not public | No | |
Publication title | Nam Ngum 5 Hydropower Project, Laos | |
Data source #SsZIdy4N | ||
File | ||
Type | Media report | |
Keep PDF not public | No | |
Publication title | Namngum 5 dam built school | |
Comment on data source | written in local dialect | |
Data source #Zgo9BKtK | ||
File | ||
Type | Company sources | |
Keep PDF not public | No | |
Publication title | Nam Ngum5 report - EIA | |
Contracts |