Deal #6521 Version 75939 Version 88123
Size in operation (production)
  • [2012-12-01, current] 1500.0 ha
  • [2012-12-01, current] 1500 ha
Comment on intention of investment
Nam Ngum 5 Hydropower, installed capacity: 120 MW, developed by an independent power producer (IPP)
Nam Ngum 5 Hydropower, installed capacity: 120 MW, developed by an independent power producer (IPP) Nam Ngum 5 Hydropower Project was designed to qualify as a greenhouse-gas-reducing project under the Clean Development Mechanism (CDM) of the Kyoto Protocol and receive carbon reduction credits that can be sold. [Source: Hobomap]
Comment on nature of the deal
The project has a 25-year concession agreement. After the end of the concession period, ownership of the plant will be transferred to the Lao government.
The project has a 25-year concession agreement. After the end of the concession period, ownership of the plant will be transferred to the Lao government. Financing for the $200 million USD project was expected to come primarily from the National Bank of China [Source: Hobomap]
Comment on implementation status
The project construction commenced in 2008 and subsequently entered into commercial operation in 2012. Source: Power Technology
Name of indigenous people
Hmong and Khmu ethnic groups ,
[Source: EIA report]
Comment on negative impacts for local communities
In the EIA report, it stated that if Nam Ngum 5 project had been constructed and completed before Nam Ngum 3 project, Xiangdet village would be also affected by Nam Ngum 5 project as a downstream impact. [Source: EIA report] However, some civil society organizations raised concern over the impact on fish migration as well as the irregular of water level that caused impact to the livelihood of local residents. [Source: RFA Lao]
Materialized benefits for local communities
Education
Comment on materialized benefits for local communities
The company contributed fund to build school at Chim village in Phoukhoun district, Lungprabang province Source: Muan.Sanook
Former land cover
Cropland, Forest land

Location #7baVEd0s

Comment
The main dam is located in Luang Prabang province, while the powerhouse is situated in Xieng Khuang province.The coordinates of the dam structure are east longitude of 102Β°27’9.13” and north latitude of 19Β°21’23.80”. The coordinates of the powerhouse are east longitude of 102Β°42’44.00” and north latitude of 19Β°21’35.83”.
The main dam is located in Luang Prabang province, while the powerhouse is situated in Xieng Khuang province.The coordinates of the dam structure are east longitude of 102Β°27’9.13” and north latitude of 19Β°21’23.80”. The coordinates of the powerhouse are east longitude of 102Β°42’44.00” and north latitude of 19Β°21’35.83”. Nam Ngum 5 is located upstream of the Nam Ngum 3 Dam Source: Hobomap

Data source #9i0IlHtw

Url

Data source #OquKGMCL

File
Type
Media report
Keep PDF not public
No
Publication title
Nam Ngum 5 dam officially open
Comment on data source
Written in local dialect

Data source #P4PjuP-F

File
Type
Other
Url
Keep PDF not public
No
Comment on data source
Written in local dialect

Data source #QIh8Ur-t

File
Type
Company sources
Keep PDF not public
No
Publication title
Nam Ngum 5 Hydropower Project, Laos

Data source #SsZIdy4N

File
Type
Media report
Keep PDF not public
No
Publication title
Namngum 5 dam built school
Comment on data source
written in local dialect

Data source #Zgo9BKtK

File
Type
Company sources
Keep PDF not public
No
Publication title
Nam Ngum5 report - EIA