Deal #5370
Panama
Created at
2016-12-19
Last update
2024-04-18
Last full update
2024-04-18
Land area
Size under contract (leased or purchased area)
- [2009, current] 262 ha
Size in operation (production)
- [2017, current] 262 ha
Comment on land area
In Panel 1's report "Barro Blanco Hydroelectric Project Panama" (2015), it is mentioned that the project consists of a hydroelectric plant at the foot of the dam, whose main works will require the flooding of an area of 258.67 hectares for the operation of the reservoir on the Tabasará River, and 5 hectares for the dam, powerhouse, and complementary works.
Intention of investment
Intention of investment
- [2009, current] Renewable energy unspecified
Comment on intention of investment
The project consists of a hydroelectric plant.
Nature of the deal
Nature of the deal
Outright purchase
Comment on nature of the deal
Generadora del Istmo S.A. (Genisa) acquired 100% of the land needed for the dam, power plant, access roads, transmission lines, and substations. Genisa also successfully acquired 97% of the land required for the reservoir.
Negotiation status
Negotiation status
- [2009, current] Concluded (Contract signed)
Implementation status
Implementation status
- [2016] Startup phase (no production)
- [2017, current] In operation (production)
Comment on implementation status
The project began operating with the authorization to start commercial operation from the Panamanian government in April 2017, following the completion of technical tests in March 2017.