Overall comment

Overall comment
Also involved in the Nacala corridor: recovery of 682 km of the existing railway in Malawi and Mozambique, the construction of a maritime terminal and 230 km of new railways, composed by a 201 km stretch connecting Moatize to Nkaya, Malawi, and 29 km linking the railway to Nacala-a-Velha