Deal #10312
Philippines
Created at
2024-05-08
Last update
2025-01-27
Detailed electricity generation information
Electricity generation
- [2015-06] On-shore wind turbines 686 ha 0 %
Number of turbines: 18 Currently installed capacity: 36 MW Intended capacity: 36 MW - [2024-01-2, current] On-shore wind turbines 686 ha 0 %
Number of turbines: 21 Currently installed capacity: 49,2 MW Intended capacity: 49.2 MW
Comment on electricity generation
Total capacity of both phases is 49.2 MW with phase 1 being 18 turbines generating 36 MW, and phase 2 adding 6 turbines generating 13.2 MW.
The Nabas Wind Power Phase 1 (NWPP-1) consists of 18 wind turbines (WTG-1toWTG-18) with a total power production capacity of 36MW, transmission lines, internal access roads, and a control station located in the barangays of Pawa, Rizal, and Unidos inNabas and Brgy. Napaan in Malay.
the Nabas Wind Power Phase 2 (NWPP-2) would involve seven additional wind turbines (WTG-19 to WTG-25) with an expected total power generating capacityof 14MW located within the northern boundary of the NPPNP.
The construction of 3 turbines of Phase 2 have been stopped. ,
Use of produce
Has domestic use
Yes
Domestic use
100 %
Has export
No
In country processing of produce
In-country end products of the project
energy production for locals