Detailed electricity generation information

Electricity generation
  • [2015-06] On-shore wind turbines 0 %
    Number of turbines: 18 Currently installed capacity: 36 MW Intended capacity: 50 MW
  • [2024-01-2, current] On-shore wind turbines 0 %
    Number of turbines: 24 Currently installed capacity: 50 MW Intended capacity: 50 MW
Comment on electricity generation
Phase 1 of the project consisted of 18 turbines generating 36 MW of energy in 2015; With the comissioning of Phase 2 in 2024, it added an extra 14 MWs and 6 turbines, thus totaling the project to 50 MW with 24 turbines